PTTGC

Ohio EPA Hosting Public Meeting on Modifications to Cracker Plant's Discharge Permit

The proposed PTTGCA petrochemical complex would be located on the west bank of the Ohio River in Belmont County.

The Ohio Environmental Protection Agency will hold a public meeting at 6 p.m. Dec. 12 to present information and accept comments on draft modifications to the wastewater discharge permit related to the proposed PTTGCA petrochemical complex, which would be located at Old Route 7 and Ferry Landing Road (Hwy. 2) in Shadyside, in Belmont County. The site is located on the west bank of the Ohio River at that location.

The information session will be held at Shadyside Community Center, 50 E. 39th St., with the public hearing immediately following. During it, members of the public can submit comments for the record concerning the draft modification. The modifications to the wastewater discharge permit conditions requested by PTTGC America LLC would:

  • decrease the levels of pollutants to be discharged to the Ohio River
  • change the locations where stormwater will be discharged
  • modify limits at an internal monitoring station that does not directly discharge to surface water
The draft modified permit is available here. Comments will be accepted both verbally and in writing at the hearing and may be submitted through Dec. 19, 2018. Written comments may be emailed to epa.dswcomments@epa.ohio.gov or mailed to Ohio EPA-DSW Permits Processing, P.O. Box 1049, Columbus, OH 43216-1049.

The U.S. subsidiary of PTT Global Chemical, PTTGC America, selected the site for the possible construction of an ethane cracker. PTTGC America's board of directors has approved the execution of an agreement between PTTGCA and a subsidiary of Daelim Industrial Co., Ltd., a leading Korean construction and chemical company, to conduct a feasibility study and secure funding for the development of the complex. Information on the company’s website indicates PTTGC America chose the site because of its location on the Marcellus and Utica shale region and its access to major highway, rail, pipeline, and port infrastructure that would increase efficiency while reducing the environmental and financial costs of transportation.

If it is built, the project will be capable of producing 1.5 million metric tons of ethylene and its derivative annually. PTTGC America is investing $100 million to conduct detailed front-end engineering design and has signed contracts with Fluor Corporation and Bechtel Enterprises Holding Inc. to conduct front-end engineering design work.

Download Center

  • Monitoring and Reporting on Air Emissions for Regulators and the Real World

    When it comes to managing compliance and regulatory issues surrounding air emissions, there are no easy jobs. With interviews from practitioners from American Electric Power, Red Cedar Gathering, Trinity Consultants, and Cority, this eBook provides practical advice to advance your air emissions monitoring and reporting programs.

  • What Every EHS Professional Should Know About ESG

    Join experts from Arcadis and Cority on April 27th to learn the most common ESG reporting frameworks and how technology can help you improve reporting efficiency, identify areas for improvement, and create defensible audit trails.

  • Green Quadrant EHS Software 2021

    Read the new report by independent analyst firm, Verdantix, to get an unbiased comparison of the 22 most prominent EHS software vendors in the industry.

  • RFP Template for Waste Management Software

    Learn the essential questions to ask when evaluating waste management software solutions with this free, ready-to-use RFP template

  • 5 Keys to Best-in-Class Chemical Management

    Running a safe chemical program is challenging and complex: from knowing what's on-site to proper handling and disposal - all while navigating regulatory changes. Learn the best ways to mitigate chemical risk, get the most value out of your data, and gain buy-in for a chemical management solution.

Featured Webinar