EBMUD Gets New Discharge Permit, Orders to Control Discharges

The U.S. Environmental Protection Agency, along with the California State Water Resources Control Board and the San Francisco Bay Regional Water Quality Control Board, have reached a settlement with the East Bay Municipal Utility District to take steps to address inadequately treated sewage discharges to the San Francisco Bay during wet weather.

EBMUD's three wet weather facilities handle excess sewage during storms when flows exceed the capacity of the district's main wastewater treatment plant. The excess flow is caused by stormwater and groundwater leaking into the region’s aging sanitary sewer pipes and through improper connections that channel storm water flow into the sanitary sewer system. Discharges from the wet weather facilities to the Bay -- which are only partially treated -- will no longer be allowed under a new regional board-issued permit that was adopted in mid January.

The order requires EBMUD to begin the studies and improvements needed to eliminate discharges from the wet weather facilities./p>

“EBMUD has stepped forward with a meaningful commitment that will yield long lasting improvements to the East Bay wastewater system and important protections for the Bay,” said Alexis Strauss, the EPA’s Water Division director for the Pacific Southwest region. “Today’s action lays the groundwork for substantial infrastructure improvements by EBMUD and the East Bay cities to replace aging sewer pipes and eliminate discharges of partially treated sewage to the San Francisco Bay.”

“The stipulated order and the board's permit work together to spell out the initial work EBMUD must do to cease its discharges of partially-treated wastewater,” said Bruce Wolfe, executive officer of the San Francisco Bay Regional Water Board. “We look forward to working with EBMUD, the other state and federal agencies, and the East Bay community in making sure the work needed to stop the discharges is environmentally effective and cost efficient.”

Under the order, the EBMUD is required to:

  • develop a program requiring repair of leaking private sewer pipes that extend from homes and businesses to city sewer mains;
  • spend at least $2 million annually in incentives to accelerate repair of private sewer pipes;
  • develop improved maintenance and repair programs for its sewers and the sewers of the contributing cities; and
  • deploy flow meters throughout the East Bay sewer network, identify areas with the highest wet weather sewage flows and identify areas for sewer repair and flow reduction.

These programs will reduce infiltration and inflow of stormwater and groundwater into sewer pipes during winter storms. Infiltration and inflow results from misconnections, cracks, and other imperfections in system pipes, joints, and manholes, and can lead to a 10-fold increase in the volume of wastewater that reaches EBMUD’s sewer interceptor pipes and wastewater treatment plant.

The order will provide data that identifies problem areas and will lay the groundwork for a future settlement to eliminate discharges from the wet weather facilities. EPA expects a final remedy, which will include EBMUD and the contributing cities, to be developed in the next several years based on the data gathered and the work initiated under the order.

EBMUD operates a large sewage treatment plant, three wet weather treatment facilities and major interceptor lines that transport sewage collected from seven East Bay contributing cities that include Oakland, Berkeley, Alameda, Albany, Piedmont, Emeryville and the Stege Sanitary District, and serves a total population of approximately 650,000. The wet weather discharge facilities are located at Point Isabel and at two locations on the Oakland Estuary.

For more information, visit: http://www.epa.gov/region09/water/npdes/compliance.html. For a copy of the order, visit: http://www.epa.gov/region09/water/npdes/compliance.html#ebmud.

Download Center

  • Monitoring and Reporting on Air Emissions for Regulators and the Real World

    When it comes to managing compliance and regulatory issues surrounding air emissions, there are no easy jobs. With interviews from practitioners from American Electric Power, Red Cedar Gathering, Trinity Consultants, and Cority, this eBook provides practical advice to advance your air emissions monitoring and reporting programs.

  • What Every EHS Professional Should Know About ESG

    Join experts from Arcadis and Cority on April 27th to learn the most common ESG reporting frameworks and how technology can help you improve reporting efficiency, identify areas for improvement, and create defensible audit trails.

  • Green Quadrant EHS Software 2021

    Read the new report by independent analyst firm, Verdantix, to get an unbiased comparison of the 22 most prominent EHS software vendors in the industry.

  • RFP Template for Waste Management Software

    Learn the essential questions to ask when evaluating waste management software solutions with this free, ready-to-use RFP template

  • 5 Keys to Best-in-Class Chemical Management

    Running a safe chemical program is challenging and complex: from knowing what's on-site to proper handling and disposal - all while navigating regulatory changes. Learn the best ways to mitigate chemical risk, get the most value out of your data, and gain buy-in for a chemical management solution.

Featured Webinar